We finally did it! We accomplished our goal to redo the shower/tub/floor in our bathroom before the baby gets here!!
Before-
Our nasty, moldy, grimy, plastic tub/shower. Eeeew.
After demolition, we found out it was actually only 4 years old! Oh well, it was time for it to go!
During-
4 full days with one plumber, two tile guys, and a bunch of dust. We don't have a second shower, so Jeremy used the gym (once!) and I showered at the neighbors (thank you Barry and Lisa!!).
After-
12X16 Porcelain shower tiles with decorative glass tile. Neat alcove for soap/shampoo, brushed nickel hardware. Ameri-cast Porcelain coated tub. 12X12 Porcelain tile floor. The granite counter top was already there.
We celebrated the successful week by going out to eat. Jeremy had to take a pic of me before we left 34 weeks, 6 days. Woohoo!!
Now that I am so wise on the subject (ha!) here is another one of my lists!
Things I learned about remodeling something in my house:
- Whenever someone is giving you a bid, make sure they include ALL material fees in the bid.
- Don't waste your time getting 5, 6, and 7 different bids. The price really isn't going to change that much. Rather, make your decision based on referrals and how you FEEL about the person doing the work.
- It's probably best to go with the same person for the entire project. We used two different people to save $300, but now I'm not so sure it was worth it. It just took too much time to coordinate between everyone.
- It's worth paying money if it means that you don't have to do it.
- Dust gets everywhere. Not just in and around the room being worked on. I mean EVERYWHERE!! A thin layer of dust will collect on every bookshelf or solid surface in the house, in closets, on the bedding, on the couch, in the kitchen, on the bread bag and fruit bowl, on pictures, everywhere!!
- Don't bother reorganizing things anytime near when your remodel happens because everything will be moved around anyway. (yes, meaning my weeks of nesting were all for naught!) Plumber had to move our baby room stuff around to get to the pipes, tile guys had to take doors off and put them in bedroom and family room, piles of organized pictures all messed up, toilet in the hallway, etc.
- Clear everything out of the room that is being worked on. Just because you put things inside a cabinet does not mean it will be safe.
- Expect extra scuffs and scrapes on your walls throughout the house.
- Don't offer your nice towels to the workers, even if it's to cover things up that they aren't working on.
- Make sure that pathways used by workers are covered with drop clothes and paper during the ENTIRE project.
- Speak up if you think something isn't right. I did a good job about this 98% of the time. It's the one time I didn't say anything that ended up costing us an extra $155 to have another guy come and fix.
- Arrange a plan with your workers to dispose of demo materials and garbage before settling a price and committing to a deal.
- Pray for guidance, and then follow promptings. There are several key decisions I made based on spiritual promptings that I know made a difference in the project. (i.e. go with the licensed plumber instead of the tile guy's friend; go to Lowe's before buying tub at Home Depot; don't decrease order on number of bullnose pieces; pay the tile guy with a check-not cash- and pay him at the very end of the project).
- Shopping for tile is like shopping for clothes. The first item you like is going to be the one you end up with. So don't make it more difficult than it has to be!
- It's probably better to remodel an entire room instead of doing it in pieces. For example, the paint and counter top was upgraded before we moved in, then we upgraded the toilet and fixtures last year, then the shower this year. But now lots of the paint is all messed up, the toilet was removed and got scratched, and tools were all over that beautiful granite, and we still have old cabinetry. So now I can see that it's better to just gut the whole thing and start from scratch. Otherwise, you end up doing double the work, double the time, and you probably don't save much money in the long run anyway.
- (This one is mostly for Jeremy) Budgets are a good thing to give you some framework, but you can't freak out when you go over budget. It's a part of life.
- (This one is mostly for SarahLynn) If you put forth the effort, you can make it happen. Sometimes, you will have to leave work early and call people when you don't feel like it, and be available when you're not used to it. But you CAN organize a remodel project, and it CAN get done! You DID IT!!